Monday, May 25, 2009












Shower in education hallway bathroom; there will be a shower in men's and women's restroom in that area in case the church is used as a shelter or disaster recovery area; there will also be generator connections for the main building and the gym


Education wing hallway















Hallway looking at nursery check-in















Office


Reception area and front door of office

Pastor's office



Entry into office area from hallway



Hallway leading from worship area to education area





Thursday, May 14, 2009











Area of lighter dirt is where the gymnasium will be located



Again, lighter dirt is gymnasium location

Gym area







View of courtyard from inside main entrance of office area








Main entrance to nursery area


Check-in area of nursery


Inside hallway of nursery





Looking down hallway from education wing toward office area/worship area



Infant room


"Crawler's" room











Youth room

Youth Room
Looking into youth room from youth Sunday School room



Youth Sunday School room



View of education hallway from front of building



















Tuesday, May 12, 2009

Construcftion progress

Beginning of brick work





Steel for covered walkway that is along the front of the building.
I apologize for not posting pictures in a few weeks, but not much has changed as the majority of the work that has occurred over that time has been mechanical/electrical work. Sheetrock work has begun in the education area and office area. As you see, brickwork has begun and the construction of the covered walkway in the front of the building has begun. Check back in a few days for pictures of some of the rooms where sheetrock is being hung.


Bookmark and Share